Loading…
Loading…
43 results • Latest
Construction of ROB in Km 7/6-8 on Huzurabad Parkal road in lieu of LC No.14 Railway Km 342/19-21 between Uppal Jammikunta Railway Station on Kazipet Ballarsha section in Warangal Urban Dist. Sub Work : Providing Central Lighting along With Bridge and approach Roads (2nd Call)
Painting to the (RnB) Division office at Medak Town in Medak District
Construction of new Toilets in the Ground floor of Two Court Building at Medak Town in Medak District (4th Call).
Construction of new Toilets in the Alladurg Court Building Town in Medak District (4th Call).
FDR to Reconstruction of 3V of 1.0 m dia Pipe Culvert in place of 1V of 600mm dia Pipe Culvert at km 0/6-8 on Alladurg Feedar road in Medak District (6th Call)
Construction of High Level Road Bridge across Manair River in between Arenda to Damerakunta in Manthani (M) Peddapally District