Loading…
Loading…
2,137 results • Recent activity
Main Work:- Rehabilitation & Upgradation of existing road to 4-lane with paved shoulders from Km 0/000 to Km 56/500 (Muddanur to B.Kothapalli of NH-716G in the State ofAndhra Pradesh on EPC mode under Annual Plan 2021-22 Sub-Work:- Providing Hire vehicle to the Executive Engineer (R&B) NH Division, Kadapa from 01-06-2026 TO 30.05.2027 (12 Months) for inspecting of the works in (R&B) NH Division, Kadapa from 01.06.2026 to 30.05.2027 (12 Months).
Providing Hire vehicle to the Deputy Executive Engineer (R&B) APRDC Sub-Division-II, Kurnool from 01-06-2026 TO 30.05.2027 (12 Months) for inspecting the works in (R&B) APRDC Sub-Division-II, Kurnool. From 01-06-2026 TO 30.05.2027 (12 Months)
Providing Hire vehicle to the Executive Engineer (R&B) APRDC Division, Kurnool from 01-06-2026 TO 30.05.2027 (12 Months) for inspecting of the works in (R&B) APRDC Division, Kurnool
Annual maintenance of Internal Electrical Installations in the premises of Lok Bhavan at Governorpet, Vijayawada for the year 2026-27.
Improvements to the Road Chittoor-Puttur road Via Narasingapuram, Balaganganapalli from km2/4-8,3/4- 7/6, 8/0-9/2,10/2-4,13/2-4 in Chittoor District (3rd call)
Improvements to Narsipatnam- Chintapalli Sileru Road (SH007) from Km 0/0 to 1/0 in Anakapalli District. (5th Call)