Loading…
Loading…
1,419 results • Latest
Industrial Grade Heavy Duty Penetrating Oil (6030 Pen Oil) (Q3), Gasket remover and paint stripper (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
S. I. T. C of Daikin VRV Outdoor unit Model No. RXYQ20ARY6 (6) RXYQ14ARY6 (6)
Facility Management Services - LumpSum Based - Commercial; Horticulture Services; Consumables to be provided by service provider (inclusive in contract cost)
Complete set of MS Crane process flow technologies make Ebonite rubber lined valve Size 100 NB, Thrust disk Part no 9, Compressor Part no10, Line diaphragm Part no 14, Complete set of MS Crane process flow technologies make Ebonite rubber lined valve Size 150 NB, Thrust disk Part no9, Line diaphragm Part no14, Compressor Part no4, Thrust disk, Line diaphragm Part no6, Complete set of MS Crane process flow technologies make Hard rubber lined valve Size 50 NB, Thrust diskPart no6, Compressor Part no7, Bonnet Part no8, Line diaphragm Part no11, Complete set of MS Crane process flow technologies make Ebonite rubber lined valve Size 50 NB, Bonnet Part no1, Spare Actuator Compressor, Spare actuator diaphragm, Complete set of MS Crane process flow technologies make Ebonite rubber lined valve Size150 NB, Line diaphragm Part no4
copper washer size 28X33mm, O ring dia 58mm, Lube oil filter, O ring dia 38mm, O ring dia 67mm, O ring for drain plug, fuel filter cartridge, worm drive hose clip, expansion bellow, Donaldson air cleaner, rain cap, copper washer size 14X20mm, hose between radiator to suction pipe, hose between pipe to thermostat, radiator water out hose, silicone hose, T bolt clamp, cylinder liner assembly, O ring for cylinder liner, connecting rod assembly, piston assembly, Oil seal pulley end, joint for oil seal housing, cylinder head assembly, inlet valve seat insert, exhaust valve seat insert, valve guide, sealing cap, valve pair, cup for valve spring, valve spring, valve collet, valve cup, valve seal, rocker lever assembly, rocker lever adjustment screw, Nut, nozzle clamp, cup washer, cylinder head gasket, cylinder head bolt, injector, gasket for rocker cover, lube oil cooler, o ring dia 29, copper washer size 8X 14, Gasket for lube oil header, gasket for cooler cover, copper washer size 30X36, Thermostat element, Joint for thermostat housing, gasket for thermostat cover, copper washer size 10X14, Water pump assembly, V belt, o ring, cup for P R Tube, Rubber bush top, rubber bush bottom, fuel filter, banjo bolt, fuel pipe for nozzle leak off, fuel pipe for pump leak off, leak off pipe, conical copper washer, Joint between inlet manifold and cylinder head, Joint main air pipe to inlet manifold, Expansion bellow for inlet manifold, Air pipe clamp bottom, aiR pipe clamp top, Nut size M8X1.25, Stud size M8 X 25, joint between exhaust manifold to expansion bellow, Joint between exhaust manifold and cylinder, Joint Between exhaust manifold and adaptor, Joint for turbo inlet, Oil seal flywheel end, Bolt for flywheel, Joint between bend to air pipe, O ring for turbo outlet, V-BAND CLAM, O RING Dia 36 for lube oil, Lube oil, Copper washer size 14X18, Joint for feed pump, Feed pump, Joint for between breather plate and adaptor, o ring for breather, o ring for oil filling pipe, copper washer size M10X16, Drain plug, fuel pipe, copper washer size 16X22, fuel filter and water separartor, rubber hose, clip for breather pipe, hose, hose t bolt clamp, big end bearing std, rocker lever bush, breather hose
PRESSURE TUBE REMOVAL AND INSTALLATION TOOLS
Split Air Conditioner, Ceiling Mount Type (Cassette) (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Point of Sale Terminal (V4) (Q2)
Linear Power Limit Control Unit
Refilling of Industrial Gases in Cylinders - Liquid Chlorine Gas; Metric Ton (MT)
Pole-Mounted Outdoor Dustbin (Q3)
Facility Management Services - LumpSum Based - Commercial; Horticulture Services; Consumables to be provided by buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Removal of hot insulation Refer BOQ; As per Scope of work and ATC, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Installation of hot Insulation Refer BOQ; As per Scope of work and ATC, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Removal of hot Insulation Radiological controlled area Refer BOQ; As per Scope of work and ATC, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Installation of hot Insulation Radiological controlled area Refer BOQ; As per Scope of work and ATC, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Removal of Cold Insulation (All area including - Both Radiological controlled area and Non- Radiation Area Refer BOQ; As per Scope.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Installation of Cold Insulation (All area including Radiological controlled area and Non-Radiation Area) Refer BOQ; As per Scope .., and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Removal of calcium silicate insulation (All area including Radiological controlled area and Non- Radiation Area) Refer BOQ; As per.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Installation of calcium silicate insulation (All area including Radiological controlled area and Non-Radiation Area) Refer BOQ; A.., and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Normal Operation/PSD: Tray/bracket Fabrication work (All area) Refer BOQ; As per Scope of work and ATC
Electric Kettlesand Jugsfor Householdand Similar Useas per IS367 (V2) (Q3)
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
Mobile Containers For Solid Waste Conforming to IS 12402 (Q3) (3 (3 ))
Household Refrigerating Appliances as per IS 17550 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Beret Cap as per IS 5085 (Q3) ( ( 3 3 ))
Renewal work on PMGSY roads against financial incentive under PMGSY Year 2023-24 Under Package No. RJ-38-FI-01/ PMGSY/2023-24 in Distt. Didwana-Kuchaman
Facility Management Services - LumpSum Based - Commercial; Horticulture Services; Consumables to be provided by buyer
Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
HIGH NEUTRON GAIN ADJUSTMENT UNIT MAKE ARROW ENGINEERING INDUSTRIES PVT. LTD.
EG-12 GRADE CARBON BRUSH OF ASSAM CARBON PRODUCTS LTD MAKE
Steel Almirah/Cabinets conforming to IS 3312 (V4) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6842583 Dated : 31-10-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Facility Management Services - LumpSum Based - SUPPLY FOR MANLAPENE HDPE PLAYING EQUIPMENTS; SUPPLY FOR MANLAPENE HDPE PLAYING EQUIPMENTS; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - SUPPLY FOR MANLAPENE HDPE PLAYING EQUIPMENTS; SUPPLY FOR MANLAPENE HDPE PLAYING EQUIPMENTS; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - SUPPLY FOR MANLAPENE HDPE OPEN GYM; SUPPLY FOR MANLAPENE HDPE OPEN GYM; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - SUPPLY FOR MANLAPENE HDPE PLAY SYSTEM; SUPPLY FOR MANLAPENE HDPE PLAY SYSTEM; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - SUPPLY FOR MANLAPENE HDPE MULTI PLAY SYSTEM; SUPPLY FOR MANLAPENE HDPE MULTI PLAY SYSTEM; Cost of consumable to be reimbursed to service provider on actual
Facility Management Services - LumpSum Based - SUPPLY FOR MANLAPENE HDPE PLAYING EQUIPMENTS; SUPPLY FOR MANLAPENE HDPE PLAYING EQUIPMENTS; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - SUPPLY FOR MANLAPENE HDPE OPEN GYM; SUPPLY FOR MANLAPENE HDPE OPEN GYM; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - SUPPLY FOR MANLAPENE HDPE MULTI PLAY SYSTEM; SUPPLY FOR MANLAPENE HDPE MULTI PLAY SYSTEM; Consumables to be provided by service provider (inclusive in contract cost)
Metal Beds (V3) (Q2) (3 (3 ))
Ultrasound Machine (V2) (Q2) (3 (3 ))
Custom Bid for: Transmitter Manifold seal PTFE‘ O’ ring for parker (Part no-HDS3M)
Hot Rolled Steel Beam, Column, Channel and Angle Sections (V2) conforming to IS 808 (Q3), M S Sheet as per IS 1079 (Unit - Mass) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Reciprocating Air Compressors-Electric Motor Driven (Q2)
INJECTION TYPHOID CONJUGATE V I CAPSULAR POLYSACCHARIDE CONJUGATE VACCINE CONTAINING 25MG OF V I -P
Stainless Steel Integral Bonnet Needle Valve, 0.37 Cv, 1/4 In. Swagelok Tube Fitting, Vee Stem. Part, Stainless Steel Integral Bonnet Needle Valve, 0.73 Cv, 3/8 In. Swagelok Tube Fitting, Vee Stem. Part, Stainless Steel Integral Bonnet Needle Valve, 0.73 Cv, 1/2 In. Swagelok Tube Fitting, Vee Stem. Part
POSITION TRANSDUCER ALONG WITH CONNECTOR MAKE: SENTECH MODEL NO. RV1KXC- RVDT, TRANSMITTER ALONG WITH CONNECTOR MAKE: SENTECH MODEL NO. SC500-2.
SPARE HAMMEL DAHL MAKE ACTUATOR DIAPHRAGMS
Vehicle Mounted Dry and Wet Garbage Suction Machine (Q3) (3 (3 ))