Loading
Loading…
Loading…
12 results • Latest
Cleaning of HSCL nala from 0.00 m to 420 m U/s side of HSCL Culvert left side of Rajghat Dam.
Construction of chute drain and Repair Cross Drain RD 2330 M to 3450 M Left flank of Earth Dam Rajghat.
Pitching work at RD 4370 m U/s left side earthen dam, Rajghat
Jungle clearance from RD 4370.00 m to 8430.00 m upstream side slope and Down stream slope of left earthen Dam, Rajghat.
Clearing of jungle and silt Cleaning of Out Fall Nala At Rd 4820m from 0.00 m to 1890m via chanderi road culvert At left side down stream rajghat.
Earth work cleaning ,pointing and painting work of left side V- notch Rajghat Dam Rajghat.