Loading…
Loading…
77 results • Recent activity
Dismantling ,fabrication, erection and alignment of side frame of primary crusher A n B side and repairing overhauling of variable speed fluid coupling of apron feeder unit no 103 A n 103 B under Raw Coal section of RWP
diversion of Colony04 New and Old Feeders to outside the proposed mining area near Wahsery More through Rajrappa Project Unit near Township area
diversion of existing HT OH lines of feeder no. 22 (6.6KV) going to Section I and Section II (old patch), with the dismantling of poles and associated hardware of the diverted lines of Rajrappa Project.
diversion of existing HT OH lines of feeder No 24(N), 8 and LT line and dismantling of OH lines of feeder no 22 passing through washery more and section II new patch of Rajrappa Project.
repairing/maintenance of the OH Line of the Loading Section along with OHE Isolator Operation at the time of Loading/Unloading of Coal Wagons under the Rajrappa Washery Project for a period of 365 days.
Comprehensive Annual Maintenance Contract (CAMC) of 15 Nos. Cameras along with Allied Accessories installed at different locations of Rajrappa Area for 01 year