Loading…
Loading…
47 results • Recent activity
Installation of new Pelton Runners at Unit 1 and Unit 2 after dismantling of the existing damaged runners and their subsequent store return
Cleaning of silt from Rammam Tunnel up to 980-meter length from Rammam Intake towards Adit under Rammam Hydel Project, St-II
Various civil works along with rectification and restoration of Floor mat at PLCC and Generator Breaker Room at Powerhouse under Rammam Hydel Project, St.-II.
Restoration and Renovation of River Bank Protection (Hill Side) beside Spillway of Lodhoma Intake and other Allied Civil Works at Lodhoma Intake under Rammam Hydel Project Stage II.
Construction of Protection Wall behind Field Hostel A at Lodhoma Colony under Rammam Hydel Project, St-II
Renovation of Drinking Water Pipeline along with construction of RCC water reservoir at Power House and Dovan Office under Rammam Hydel Project, Stage-II