Loading…
Loading…
67 results • Recent activity
Construction of Pucca road on left bank of Rapti Main Canal from Km. 114.00 to Km. 125.682 in Distt.-Siddharth Nagar
Construction of wing wall on constructed V.R.B./D.R.B between km. 25.000 to Km. 39.147 of Campierganj Branch in Distt.-Siddharth Nagar
Construction of kulawa from km 0.000 to km. 11.300 Left and Right Bank of Maina Dy.
Bituminous Painting on Approach Road of constructed D.R.B. at difference chanage in between km. 98.000 to km. 105.000 of Rapti Main Canal and constructed V.R.B/D.R.B. at difference chanage Birdpur Dy.
Bituminous Painting on Approach Road of constructed D.R.B. at different chainage in between km. 105.500 to km. 109.000 of Rapti Main Canal and constructed V.R.B/D.R.B. at different chainage Pakdihwa Minor.
Bituminous Painting on Approach Road of constructed D.R.B. at different chainage in between km. 109.500 to km. 114.000 of Rapti Main Canal and constructed V.R.B/D.R.B.at different chainage Khairi Minor and Talkunda Minor