CONTRACT FOR RENOVATION OF BALANCE OFFICES AT EAST WING ON FIRST FLOOR OF TECHNICAL BUILDING FOR AMMONIA AND UREA PLANT AT RCF THAL
STABILITY CERTIFICATION OF BALANCE OFFICES AT EAST WING ON FIRST FLOOR OF TECHNICAL BUILDING AS PER RCF'S PROFORMA DUE TO CHANGE IN LOADING CONDITIONS & SUBMISSION OF AS BUILD DRAWINGS AFTER COMPLETION OF CONSTRUCTION, INCLLUDING NECESSARY FORTNIGHT SITE VISITS DURING EXECUTION.
SUPPLY OF ROCK PHOSPHATE AND/OR NPK (15-15-15) IN BULK
ITEM NO: 1.0 ( ROCK SHIPMENT)
AN-87474 ID FD TURBINE SPARES
ITEM NO: 1
CONTRACT FOR CONSTRUCTION OF NEW SHED OVER SLUDGE DRYING BED AND SODIUM HYPOCHLORIDE STORAGE AREA IN ETP AT RCF THAL
EARTHWORK IN EXCAVATION BY MECHANICAL MEANS (HYDRAULIC EXCAVATOR)/ MANUAL MEANS IN FOUNDATIONS OF BUILDINGS, FOOTINGS, COLUMNS, PLINTH BEAMS, WALLS MACHINE / EQUIPMENT FOUNDATIONS ISOLATED PITS, PAVEMENTS, TRENCHES FOR PIPELINES / CABLES, PIPE SLEEPERS DRAINS ETC., TO THE REQUIRED LEVELS AND GRADES IN BOTH DRY AND WET CONDITIONS,INCLUDING DEWATERING, RAMMING OF BOTTOMS, GETTING OUT INCLUDING DRESSING OF SIDES AND EXCAVATED EARTH WITH LIFT UP TO 1.5 M INCLUDING STACKING WITHIN A LEAD OF 150 M , LEVELING, BACKFILLING AND DRESSING ETC., COMPLETE AS PER DIRECTION OF ENGINEER-IN-CHARGE IN ALL KINDS OF SOILS,HARD MURRUM AS DEFINED IN IS : 1200 INCLUDING PROVIDING TEMPORARY SUPPORTS TO ALL SERVICE LINES SUCH AS OVERHEAD AND UNDERGROUND WATER SEWAGE AND DRAIN PIPES, CABLES ETC AND SHORING AND STRUTTING WHEREVER NECESSARY, COMPLETE IN ALL RESPECTS AS PER DIRECTION OF ENGINEER- IN - CHARGE
CONTRACT FOR PROVIDING AND FIXING FIRE DOORS AT VARIOUS ELECTRICAL INSTALLATIONS IN SGP, WTP AT RCF THAL
Dismantling door (steel or wood shutter/s) including frame, holdfasts etc. complete and stacking within 50 metres lead as directed.
CONTRACT FOR MISC. ALUMINIUM AND GLAZING WORKS IN FACTORY AT RCF THAL
Providing & fixing 3 mm thick plain sheet glass to existing steel window panels. Rate includes removal of broken glass (if any) carefully, removal of old putty and Providing and applying new putty etc. complete.