Loading…
Loading…
308 results • Recent activity
Balance work of distribution line at Nabagram village with Jack pushing work for smooth running of scheme at Nabagram G.P within Pandabeswar Block under RCFA Division-I PHE Dte.
Additional work of sinking of 3 nos 300 mm dia river bed tube well in the river Ajay at Darbardanga including installation of gate ,land development , Boulder pitching and other allied works at H/W site for Bijaynagar Housing piped water supply schem
De-watering cleaning of muddy and slushy soil including repairing and renovation brick pitching and cleaning of site near Lake near at Kalyaneswari Township under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. (Part-A)
Laying distribution system including FHTC for 5 (Two) nos uncovered village viz. Namokeshia and Jorbari within Salanpur Block under Augmentation of RCFA Part-II (Zone-10) PWSS under RCFA Division-I PHE Dte.
Annual Operation and maintenance of Pariharpur under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2024 to 31.12.2024)
Balance work for laying and pushing of 600 mm Dia RCC (NP3) Hume pipe by adopting trenchless technology (e.g, Jack Pushing method) at Roy para to electric supply road of PWD roads under JJM Under RCFA Division-I ,PHE, Dte