Loading…
Loading…
367 results • Recent activity
Additional work of sinking of 3 nos 300 mm dia river bed tube well in the river Ajay at Darbardanga including installation of gate ,land development , Boulder pitching and other allied works at H/W site for Bijaynagar Housing piped water supply schem
De-watering cleaning of muddy and slushy soil including repairing and renovation brick pitching and cleaning of site near Lake near at Kalyaneswari Township under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. (Part-A)
Laying distribution system including FHTC for 5 (Two) nos uncovered village viz. Namokeshia and Jorbari within Salanpur Block under Augmentation of RCFA Part-II (Zone-10) PWSS under RCFA Division-I PHE Dte.
Annual Operation and maintenance of Pariharpur under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2024 to 31.12.2024)
Balance work for laying and pushing of 600 mm Dia RCC (NP3) Hume pipe by adopting trenchless technology (e.g, Jack Pushing method) at Roy para to electric supply road of PWD roads under JJM Under RCFA Division-I ,PHE, Dte
Additional for laying different dia DI pipe and HDPE pipe, water body crossing and road crossing including allied work for Namkesia village of Daskheary Housing Project under RCFA Division-I PHE Dte.