Loading…
Loading…
84 results • Latest
Additional work for reconnection of FHTC and some portion relaying of HDPE pipeline at Byepass of Natungram village under Napara PWSS under RCFA Division-I PHE Dte.
Emergency repairing of 2 nos provision of AC photovoltic submersible solar within the bore well/tube well along with 2400 watt peak capacity solar photovoltic array on MS structure to meet up water demand during summer season at Saraswatiganj,Lohagur
Balance work of laying rising main PE-80,PN-10 HDPE from Malandihi pump house to Malandihi OHR under Bistupur water supply scheme under RCFA Division-I PHE Dte
Additional work of construction of IEP drain,and platform ,blower room and other allied works at Ijjatgunj under augmentation of Kanksa zone-II C piped water supply scheme under RCFA Division-I PHE Dte.
Additional works for distribution pipeline including interconnection and FHTC at Jhagra village (Purba Para) under RCFA Part-III Zone-I water supply scheme under RCFA Division-I PHE Dte.
Road restoration ,rubbish removal from the dismantaling of distribution pipeline of RCFA Part-II piped water supply scheme including FHTC and allied work under RCFA Division-I PHE Dte. (Zone-7, Segment-3)