Loading…
Loading…
427 results • Recent activity
S R work of Sub Divisional Store Building Sidhi, Sub. Dn. Sidhi, Distt. Sidhi, PWD Building SOR w.e.f 01-01-24
Const of 04 No Toilet at Several Places in Distt. Court Building and 01 NoToilet Beside Adhiwakta Sangh Library at Distt Court Campus Sidhi Under Sec. HQ 01,Sub. Dn. Sidhi, Distt. Sidhi, PWD Building SOR w.e.f 01-01-24 2nd Call
Const of Ayurvedic Aushdhalay Building with Eletrcificaion work at G.P. Chakdaur Sub. Dn. Sidhi, Distt. Sidhi, RES SOR w.e.f 11-04-22 2nd Call
SURVEY WORK WITH PREPARATION OF D.P.R. FOR CONSTRUCTION OF BARIGAWAN- PARSAUNA- WAIDHAN (MP-MDR-12-A-1) LENGTH 27.28 KM. FOR PROPOSED FOUR LANE ROAD, UNDER PWD SUB DIVISION WAIDHAN, DISTT. SINGRAULI (M.P.)
SURVEY WORK WITH PREPARATION OF D.P.R. FOR CONSTRUCTION OF PARSAUNA TO MADA (MP-MDR-12-14) LENGTH 24.61 KM. FOR PROPOSED FOUR LANE ROAD, UNDER PWD SUB DIVISION WAIDHAN, DISTT. SINGRAULI (M.P.)
Providing Electrification work M.O.W., S.R. and Deposite work in Residential Building Under P.W.D. B/R Division Anuppur