Loading…
Loading…
16 results • Recent activity
Preparation of detailed contour survey at surrounding area of 3 nos electric tower point over river muriganga for hydrological study in connection with the proposed construction of 4 lane road bridge
Miscellaneous supportive survey ancillaries work in connection with verification of RL values of 155 nos AWLR stations and 10 no BM pillars using NRTK method from reference CORS stations at different work sites throughout the West Bengal
Assessment of new navigation routes from New Bakkhali riverside point Kakdwip to Kuchuberiya jetty Sagar Island in respect of Ganga Sagar Mela 2025 to be conducted by the River Research Institute under Irrigation Waterways Department
Assessment of present cross sectional profile with topographical survey of chemaguri khal at kakdwip Block at south 24 Parganas District under Kakdwip Drainage Division I W Dte to be conducted by River Research Institute
Annual maintenance by jungle cutting along both side of shoulders of all road fencing and boundary of a strip of 3 metre regular maintenance hedge etc
Estimate for collection of soil samples for Geotechnical Investigation at different location including laboratory testing for design of 5 bridges over Durbachati River Solatopa River Bhosra Khal Local Drainage Channel at Daspur I II block