Loading…
Loading…
17 results • Latest
Short term maintenance contract( STMC) estimate from km 0/0 to 24/329 km of NH-153B and km 0.310 to 0.520, km 1.680 to 1.980,km 10.050 to 10.410, km 16.480 to 16.860, km 26.200 to 26.640 of NH-220 in the state of Odisha for the year 2025-26
Repair to unrectified maintenance work of NH-57 from km 50/000 to 140/900 km for the year 2026-27
Road safety measures to NH-26 such as fixing of Thrie metal beam crash barrier from Km 351500 to 383500 Km and from Km. 409160 to 434130km at different stretches for the year 2025-26(2nd Call)
Reconstruction of Bridges Major Bridge at Takera at Ch 184.200 and four Minor Bridge at Ch189.400, 190.600,191.400 and 193.200 on NH-57 in the state of Odisha on EPC mode
Construction of new Major H.L. bridge utei at km. 87.900 on NH 59 in the state of Odisha on EPC mode
Construction of Proposed HL Bridge over Local Nallah at Ch 96.400 Km over Gadgadi River at Ch. 105.550 Km and Widening and Strengthening from Ch 91.720 to 91.920 Km on NH-153 (B) in the State of Odisha on EPC Mode