Loading…
Loading…
6 results • Latest
Construction of Km. 85.480 and its approaches in Duburi Brahmanipal section of NH 720 over proposed canal crossing at RD 104.130 Km of Rengali left bank canal under RIP Phase II Deposit work in the state of Odisha on EPC Mode 2nd Call
Replacement of flexible pavement with rigid pavement in mining zone sections of Rimuli Koida section of NH 520 km 163 to km 206.200 in the state of Odisha
Supply, Installation, Testing, Commissioning, Operation and Maintenance of Centralized Control and Monitoring System CCMS for Street Lighting on National Highways under RO Odisha on Five 05 Year Contract Basis.
Execution of Balance work at Risk and Cost of the Contractor of Cuttack Angul section of NH 55 Package 1 from Km 0.4 to Km 60.2 in the state of Odisha
Advanced field preparation,1st year plantation and subsequent 2 year maintenance of 95259 no of bamboo species and 10000 no of avenue species under PIU Sambalpur,Keonjher and Dhenkanal in the state of Odisha under Regional Officer,Odisha
Construction of RCC Drain in selected stretches from km. 117.980 to km. 129.900 in chandikhole bhadrak section of NH 16 in the state of Odisha 2nd call