Loading…
Loading…
6 results • Latest
Construction of Major Bridge with Approaches as per IRC-MoRTH Standards at Km. 127.630 of Aligarh-Moradabad section of NH-93 (New NH-509) in the State of Uttar Pradesh on EPC Mode
Supply, Installation, Testing, Commissioning, O and M of Centralized Control and Monitoring System (CCMS) for Street Lighting on National Highways under NHAI, RO-UP (West), Lucknow on Five (05) Year Contract Basis
Supply, Installation, Testing, Commissioning, O and M of Centralized Control and Monitoring System (CCMS) for Street Lighting on (i) Zirakpur-End of Sangrur Bypass section of NH-64 (New NH-07) from Km. 0.000 to Km. 123.900 and (ii) Start of Sangrur
Construction of 6 lane VUP at Km. 317.430, Nagria Mod Shahjahanpur for improvement of MoRTH identified Blackspot on Bareilly-Sitapur section of NH-30 (old NH-24) from Km. 262.000 to 419.590 in the state of Uttar Pradesh on EPC Mode
Construction of 6 Lane VUP at Ch. KM (62.680) on Jhansi-Lalitpur section of NH-44 in the state of Uttar-Pradesh on EPC Mode
Construction of 6 Lane Grade Separator Structures 03 Nos with Approaches and Service Roads, including AD Lane, at Km 218.200 Sindhauli Junction, Km 233.500 Radha Krishna Mandir, and Km 237.400 Jhumka Tiraha, on NH-530 Moradabad Bareilly Section in UP