Loading…
Loading…
74 results • Recent activity
Routine Maintenance (including overlay on the required staggered stretches) and Incident Management of 2 Lane plus PS configured Bhiwani-Jind Section of NH-709A from Km 6.875 to Km 68.857 for 1 Year.
Regarding Construction of Foot Over Bridge at Chainage 34.700 Km. near Kheri Gandia Govt. School, Tehsil Rajpura on NH-07 in the State of Punjab (2nd Call).
Construction of 4 lane VUPs at Km. 240.555, 240.658 and 242.212 with slip roads on both sides on Punjab/Haryana border to Jind Section of NH-71 in the State of Haryana
Independent Engineer Services during O and M stage of four-lane Zirakpur-Parwanoo Section of NH-05 (Old NH-22) from Km. 39.960 to Km. 67.550 including Pinjore- Kalka-Parwanoo Bypass in the states of PB, HR and HP under NHDP Phase-III A on BOT Basis
Consultancy Services for Supervision Consultant of Operation and Maintenance of four-laning of Ambala-Kaithal section of NH-65 (new NH-152) from Km. 0.000 to 3.700 and 46.200 to Km 95.360 and Ambala-Saha section of NH-444A from Km. 0.000 to Km 14.840
Strengthening/Bituminous Overlaywork and RoutineMaintenance including Incident Management ofsection starting from its junction with NH-148B near Jakhal connecting Lehra Gaga and terminating at Sunam on NH-148BB (TotalLength38 Km) in State of Punjab.