Loading…
Loading…
33 results • Recent activity
Short Term Maintenance work from Km 70.00 to km 205.00 and Km. 210.00 to 238.00 and Km 243.00 to 263.115 On NH-121 (New-309)
Construction of 70.0 M Span Steel Truss Bridge over Mandakini River at Km. 35 (Kund) on NH-107 in the State of Uttarakhand under Annual Plan 2025-26
Consultancy Services for Authority Engineer for supervision of Construction of Champawat Bypass 2 lane with paved shoulder km 121.700 to km 129.450 on NH-09 Old NH-125 in the state of Uttarakhand under Chardham works on EPC mode.
Landslide treatment work from Ch 341.00 to Ch 341.300 (Design Ch. 336.400 to 336.700) (at Farasu) on NH-07 (Old NH-58) in the State of Uttarakhand under Annual Plan 2025-26.
Treatment of 04 nos. of landslide location (Ch. 11.447 km to 11.690 km, CH 23.950 km - 24.270 km, Ch. 74.366 km to 74.471 km and 74.590 km to 74.650 km) on NH-107 in the state of Uttarakhand under Annual Plan 2025-26
Rehabilitation and up-gradation to 2-lane configuration of Udiyari Bend to Kanda road from km 73.66 to Km 103.25 (Existing Chainage 80 to Km 110) of NH-309A in the State of Uttarakhand (Package-I) under NH(O)