Loading…
Loading…
16 results • Recent activity
Consultancy Services for Independent Engineer services for supervision of Eastern Peripheral Expressway (6 lane from Km. 1.000 to Km. 136.000) of NE 2 in the National-Capital Region (NCR) on toll operate maintain and transfer basis (ToT Bundle 7)
Construction of 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km 112.535) including widening of the existing 4lane highway to 6lane from Km 112.880 to Km 115.680 of the Meerut-Haridwar NH-58 in the state of Uttar Pradesh on EPC
Consultancy Services for Preparation of DPR for 6-lane Road from Harsaru bypass of Gurugram Pataudi road at Wazirpur (NH352W) to Jhajjar (NH-352) including construction of Farrukhnagar Bypass (Approx. Length 33 KM)
Construction of Flyover/Grade Separators at Balwa Junction (Km 35.320) and Banat Junction (Km 43.380) on NH 709AD and NH 709B including associated road works and structures in the state of Uttar Pradesh on EPC mode
Maintenance of Six Lane Gurgaon-Jaipur Section of NH-48 (old NH-8) between km 42.700 to km 107.100 in the State of Haryana on item rate (percentage) basis.
Emergent work of Short term rectification measures for Black spots Accident spots protection railings at Foot Over Bridge locations and Fish Plates for closing of Gaps in Median and installation of NHAI Project Information Sign Board Horizontal Signs