Loading
Loading…
Loading…
14 results • Recent activity
Construction of 6-Lane Underpasses (3 Nos) and allied works on Existing 4 Lane Hyd to Blr Sec of NH-44 from km 99.700 to 187.300 in the State of TG on EPC Mode, as part of Long-term Rectification of MoRTH Identified Black Spots TG-03-71, TG-05-39
IE Services during OnM Period for Four laning of NH-365A from Kodad (Design Km 0.00/ Existing Km.185.00 of NH-65) to Khammam (Design Km.31.800/ Existing Km.29.400) (Design Length 31.800 Km) in the State of Telangana under Bharatmala Pariyojana on HAM