Loading…
Loading…
38 results • Latest
Shifting height raising of High Tension line for New Four Lane Bypass to Parbhani City Parwa to Asola Km 463 265 to km 481 180 Design Ch 19 220 to Ch 34 434 Length 15 214 Km section of NH 61 on EPC mode in the state of Maharashtra
Maintenance of Rehabilitation and upgradation of Akola Akot (Total Length 30.45 km) to two lane with paved shoulders configuration of NH161A in the state of maharashtra at Risk and Cost of EPC Contractor
Construction of Road Protection measures from km.110-000 to km.176-000 (Section between Mokhada to Jawhar) on NH-160A in the State of Maharashtra. on EPC mode.
Balance Leftover work of Rehabilitation Up gradation of Arvi to Talegaon Km 59.900 to 73.600 to Two Four lane with paved shoulder standards section of NH-347A on EPC mode in the state of Maharashtra
Construction of service roads, improvement of junction and curves between km 585.600 to 593.340 km along Canacona bypass section of NH-66 in the State of Goa on EPC Mode.
Construction of Major Bridge including construction of approach road and RCC gutter on Sina River at km 214.180 Kalyan Ahmednagar Pathardi road NH 61 Old NH 222 in the State of Maharashtra.