Loading
Loading…
Loading…
38 results • Latest
Balance work under Risk and Cost for Up gradation of Paithan Pategaon Mungi Hatgaon Bodhegaon Ladjalgaon Ghogaspargaon Phulsangvi Ukhandachakla Dahiwandi Shirur to 2 lane with paved Shoulder 4 lane Configuration Package 55 937 Km for
abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas