Loading…
Loading…
120 results • Recent activity
Flood Damage Repairs to Kalyan-Murbad- Malshej Ghat- Nirmal Road NH-61 Km. 90/500 to 91/900 (Construction of Retaining wall).
Rehabilitation and upgradation of Patur-Balapur-Shegaon section of NH-161G from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (Total Length-49.600 km) to 4LPS configuration in the State of Maharashtra on EPC Mode
Second Call for Balance work of Rahabilitation and up-gradation Indapur to Wadpale (Design Ch. 87/100 to 91/600 and 99/100 to 110.750) section of NH66 in state of Maharashtra to four lanes with paved shoulders under NHDP- IV on EPC mode, Work on Risk
Rehabilitation Upgradation of existing highway to Two Lane Four Lane of Karad Tasgaon (From KM 0/000 to Km 58/830) Section of NH-266 on EPC mode in the State of Maharashtra. Reg. Repairing of Approach Road
Consultancy services for AE for supervision of Rehabilitation and upgradation from of Kolde to Visarwadi (Near Junction with NH-6) section of NH752G (total length -4.40) to 2LPS/ four lanes in the State of Maharashtra on EPC mode.
Consultancy services for AE for supervision of Rehabilitation and Up-gradation from Design Ch km 35.300 to km 65.740 of NH-166G (Gaganbawada to Kale) to 2LPS in the state of Maharashtra on EPC mode.