Loading…
Loading…
16 results • Recent activity
Strengthening of 2 lane with paved shoulder from Surajpur (Shilfili) to Ambikapur (from Km 363.000 to 373.500, total length of 10.50 Km) section of NH-43 on EPC mode in the State of Chhattisgarh
Widening and strengthening with paved shoulder from km.25.530 To km. 31.540 total 6.01 km. and reconstruction of box cell in km. 25.700. km. 25.925, km. 26.875, km. 27.150, km. 27.225, km. 28.900, km. 30.200, and 31.200 (HPC) Of NH-30 (Old NH-221
Balance work estimate of Rehabilitation and upgradation of NH-43 from Km 468.600 to 531.250 (Pathalgaon to Kunkuri Section) to two lane with Paved Shoulder in the state of Chhattisgarh on SBD mode under NH(O).
Construction of Keonchi Ratanpur Road of NH45 (from Design Ch. km 0.000 to km Ch. 5.275) (Pkg03 Design Length 5.275km) to Four Lane with paved shoulder configuration on Engineering, Procurement and Construction Mode in the State of Chhattisgarh
SHORT TERM MAINTENANCE CONTRACT(STMC) OF ROAD FROM KM 130.000 TO 162.670 and KM 170.800 TO KM 180.000 (KANKER-BEDMA SECTION). OF NH-30.
Special Repair In Chhattisgarh State At Chainage Km. 28.600 to 28.800,46.600 to 46.800 And 101.100 On NH30 Jagdalpur Sukma Konta Road At Chainage Km.127.800,158.400,165.600 And 206.800 On NH63 Jagdalpur Geedam Bijapur Section.