Loading…
Loading…
308 results • Recent activity
Installation of new feeder panel at old emulsion godown and new wiring with allied electrical works at new emulsion godown under Asphaltum Department Palmer Bazar.
INSTALLATION OF CENTRAL WATER DISTRIBUTION PUMP CONTROL PANEL AND RE-WIRING OF CENTRAL PUMP ROOM WITH ALLIED ELECTRICAL WORKS UNDER ASPHALTUM DEPARTMENT PALMER BAZAR.
Repairing of gear box and pugmill shaft of Batch Mix Plant under Asphaltum Goragacha.
Repairing and Overhauling of OB 54 10 ton capacity, Jessop Make Road Rollers F.I.P, clutch, Gear Box, oil pump, Engine, Body, canopy and other allied mechanical works at Road Roller Deptt.
Repairing and Overhauling of Body, Shed, Engine,oil pump with other mechanical works and Painting of Roller No. OB 91 10 ton Capacity at Road Roller Deptt
DEVELOPMENT OF ROAD SURFACE BY LOWERING AND ALLIED WORKS FROM 6/1 BANERJEE PARA ROAD TO 24 PANCHANANTALA ROAD WITH BLACKTOP SURFACE IN WARD NO-115, BR-XIII UNDER ROADS MECHANICAL DEPARTMENT.