Loading…
Loading…
115 results • Recent activity
Laying underground RCC 900 mm dia NP3 pipeline for dewatering flood water from low lying area of village Ladhout outfall into Makrauli Link Drain at RD 8600/L
Laying RCC Pipeline 600 mm dia for dewatering of flood water from low laying area of fields of village Anwal and protection of Abadi area of village Anwal out fall in to Meahm drain at RD 17500/R.
Remodeling of Bhiwani Sub Branch from RD 49000 To 79000 including construction of Head Regulator at RD 61200-R and various ghats.
Laying underground RCC 900 mm dia NP3 and 600 mm dia NP3 pipeline for dewatering flood water from catchment area of Assan Link Drain at outfall RD 24000 (Tail) with Construction of Pump Hosue at RD 24000 Tail of Assan Link Drain in village Assan Dist
Remodelling of Bhiwani Sub Branch from RD 27000 to 49000 including construction of VR Bridge-cum-Head Regulator at RD 46000 and various Ghats.
Constructing RCC Protection Wall from RD 0 to 2280 Left side of Madina Link Drain to protect village abadi of Mokhra Kheri