Requirement of spares for EVEREST make Air blowers installed at Unit 1 to 4 CTPP Chhabra
Blower for SSF (Everest make) Twinlobe-M 5175, Sr. No. EB-0806415,Capacity 410M3/Hr, Disc. Pressure 2.5 MWC, RPM-1320, for SSF Plant( 02 Nos.)
Annual Rate Contract for supply of HSD to various power plants of RVUN (KTPS, STPS,STPS_SC, CTPP, CTPP_SC, KaTPP
SUPPLY OF HSD
PURCHASE OF MS KIRLOSKAR BROTHERS LIMITED MAKE CW AND ACW PUMPS SPARES FOR STPS (O and M), SURATGARH
CW Pump Stage-II Pump Model :BHQ 95M
Requirement of Stock Redler make Dt 9 Controller, Techo generator sensors, Load cells of gravimetric coal feeder of Unit 1 and 2 (2X600 MW) KaTPP, Jhalawar
DT 9 Controller with HMI display, Model No – AC26606-1, Make - Stock Redler, Part No.- AC26606-1, DT9 Controller Upgrade Kit with HMI along accessories
Supply of EIP make spares of ESP (250 MW unit) at Unit 1 to 6, SSTPS, Suratgarh
Item Description
Design, Engineering, Manufacturing, Supply and ETC of 50 MVA, 400/6.9/6.9 kV Station Transformer, and Dismantling and Shifting of existing HEIL make 50 MVA, 400/6.9/6.9 kV Station Transformer at CTPP, Chhabra
Design , Engineering , manufacturing and supply of 50 MVA, 400/6.9/6.9kV station transformer along with fittings & its ac- cessories for CTPP, Chhabra