Loading…
Loading…
580 results • Recent activity
Annual Maintenance contract of Routine, Breakdown And Capital Maintenance Of C and I Equipments and Instruments for Stage-I, Phase-I and II, Chhabra Thermal Power Project, Chhabra
RCC Flooring in Silo parking area and CC Road Work from Silo to Ash Dyke at KaTPP, Jhalawar.
Supply of C PVC SCH 80 pipes, fittings and valve for chlorine dosing line at fore bay Stage I to IV, 33percent conc. HCL storage and measuring system installed at DM plant Stage I/II at STPS, Suratgarh
Removal of silt from downstream and upstream of canal, Intake gate and Lining Repair Work at MHP, Mangrol, Baran
Annual Work contract for Rubber Lining of Vessels, Tanks, Pipes and Fittings in DM Plant of 2X660MW, U#7 and 8, SSCTPS, Suratgarh.
Civil work of storm water drain in marshalling yard area at CSCTPP, Chhabra