Loading…
Loading…
49 results • Recent activity
Fuel Free Solid Waste Incinerator (Q3) ( ( 3 3 ))
Laboratory Steel Furniture (Q3) (3 (3 ))
Collection & Disposal Waste Management Service - Collection; Dry Waste
Water Cooler, MS Frame, Stablizer, CPVC Pipe, Concrete, Electrical Connection, Weld Mesh, Water Tank 500 Ltr, Installation, RO
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6983609 Dated : 10-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 160000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Back Extension (Version 2) (Q3), Cross Trainers (Q3), Dip Chin Assist Machine (Q4)