Loading…
Loading…
1,034 results • Latest
RO Plant with Genset and Trolley (Q3)
Signage Board (V4) (Q3)
Potable Water Purification System DE-Ionization Based (Q3)
Almirah or Cabinets (Handicraft) (V2) (Q3) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - GRAM PANCHAYAT BORNA LIBRARY WORK; Furniture, LIBRARY INSTALLATION IN PANCHAYAT AND SUPPLY OF ALL ESSENTIAL ITEM, Tower AC; Service Provider
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Garden Swings (Q3), Seesaw for Playground (V2) (Q3), Play Ground Merry Go Round (V2) (Q3), Outdoor Slide (V2) (Q4), Spring Rider (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Potable Water Purification System DE - Ionization Based (Q3)
12 Watt White-LED Based Solar Street Lighting System As
Unbranded Bench top type model Recirculating chiller, Capacity, Unbranded Bench top type model Recirculating chiller, Capacity 12.5 Ipm
Unbranded Bench top type model Recirculating chiller, Capacity, Unbranded Bench top type model Recirculating chiller, Capacity 12.5 Ipm
EFFLUENT TREATMENT PLANT (Q3)
EFFLUENT TREATMENT PLANT (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Study table -5 Pcs, Chair-16 Pcs, Almirah-6 Pcs, Books-200 Pcs, Fan-5 Pcs, Globe-01 Pcs, Freedom fighter photo-10 Pcs, Wall Paint (50 L) and Furnitures; Se..
Drinking Water ATM/Water Vending Machine (Version 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7118564 Dated : 16-01-2026 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Drinking Water ATM/Water Vending Machine (Version 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7118598 Dated : 16-01-2026 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Multi Adjustable Bench (V2) (Q3), 45 degree Leg Press or Hack Squat Machine (Q3), Cable Cross Over (Version 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid Number : GEM/2026/B/7118510 Dated : 16-01-2026 Bid Document 1/19 Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Air Walker/Stroller - Outdoor Gym Equipment Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Signage Board (V4) (Q3)
Signage Board (V4) (Q3)
Signage Board (V4) (Q3)
Signage Board (V4) (Q3)
RO Plantwith Gensetand Trolley (Q3)
Table (Handicraft) (V2) (Q3)
RO Plantwith Gensetand Trolley (Q3)
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Styling Chair/Salon Chair/Swiveling Barber Chair (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
12 Watt White-LED Based Solar Street Lighting System As Per MNRE Specification (Q3)
Parallel Bar - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Chest Press - Outdoor Gym Equipments (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3) (3 (3 ))
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Seesaw for Playground (V2) (Q3), Garden Swings (Q3), Outdoor Slide (V2) (Q4) (3 (3 ))
Waste Container (V3) (Q4) (3 (3 ))
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3)
Signage Board (V4) (Q3)
Potable Water Purification System DE - Ionization Based (Q3)
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Sanitary Napkins Incinetator Machine with Smoke Control Unit (Q3) (3 (3 ))
Drinking Water ATM/Water Vending Machine (Version 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7125882 Dated : 19-01-2026 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Garden Bench (Q3)
Garden Bench (Q3)
Garden Bench (Q3)
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))