Loading…
Loading…
76 results • Recent activity
Compact Weather Station (Q3) (3 (3 ))
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Seesaw for Playground (V2) (Q3) (3 (3 ))
Microscopes - Pathological and Research as per IS 4381, IS 5204, IS 4381, IS 5204 (Q3) (3 (3 ))
Boxing Gloves 10 to12 oz, Cotton Hand Wraps Grip 4.55m, Boxing Leather Pads, Punching Bag Immortal Super Leather 40Kg, Hight 120cm, Punching Bag Dia 39cm, Length 150cm, Leather Speed Bag with Swivel, UPGO Freestanding Punching Bag 70 In 205Lbs., Polyester and Mesh Fabric Boxing Short and Vest, Boxing Short and Vest Red Blue, Skipping Rope 366cm, Match Shoes S.M.L.XL Size, Gum Shield, Head Gear S.M.L Red Blue, Archery Wooden Bow Regular Size, Wooden Bow Small Size, Compound Bow Gen x, Archery Cane Arrow Wooden, Carbon Archery Arrow 30 31 Inch 100, Target Board 4x4 Feet, Target Stand Wooden Still, Archery Colour Target Faces 40 cm, Four in One Archery Targets Face, Bow Stand, Arm Guards, Finger Gloves, Compound Puller, Bow Maintenance Accessories Each Bow, Arrow Quiver, Wrestling Jersey Red and Blue, Langot, Match Shoes S.L.M. XL, Mugdar 1.5 to 2 Kg, Climbing Rope 20 Fit, Kabaddi Taekwondo Karate Kho-Kho Mat USI Interlock EVA Foam Red Blue 35 mm. 1x1 mtr.
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7076230 Dated : 13-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 60 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 15000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/8 Beneficiary : Assitant Professor RUSA MUMBAI, Higher and Technical Education Department Maharashtra, Directorate of Higher Education, (Shivaji Narayan Khadake)
People Link 55 Inch Display Interactive Panel with CPU with, People Link 55 Inch Display Interactive Panel with CPU with warranty 3 Years