Loading…
Loading…
61 results • Recent activity
Replacement of old CRD system of stacker cum reclaimer and reclaimer with the high performance energy chain system of CHP, CSCTPP, Chhabra
Supply of Spares for Coal Pulverisers (Type MVM 32R) of Unit 5 and 6 CSCTPP, Chhabra
Annual contract for collection / lifting and disposal of fly ash from 6x1000 MT RCC Main Silos/2x400 MT Intermediate Surge Hoppers (in case of emergency) of Unit5 and 6, CSCTPP to CSCTPP Ash Dyke or any other designated place and spreading of the ash
Annual Maintenance contract for online data monitoring and transmission of stack emission and effluent parameters of (2x660 MW), CSCTPP, CHHABRA to RPCB and CPCB Servers
Annual Contract for Routine,Break Down n Capital Maintenance and Man Power Assistancefor Upkeeping and Routine nPreventive checking/Maintenance nmiscellaneous works of various CnI Systems, Instruments Equipments of U5n6 and Common Systems at CSCTPP
Annual Maintenance Contract for six nos ECE make TG Building Service Building Boiler unit 5 and 6 and ESP unit 5 and 6 Traction Elevators installed at CSCTPP Chhabra