Loading…
Loading…
109 results • Recent activity
Removal, Supply and Application of Thermal Insulation of HP and IP Turbine, Control and Stop valves, Overload valves, Cross-over pipes etc. of Unit 7, 660 MW, SSCTPS, RVUN, Suratgarh
Annual Works of Radiography and Ultrasonic Flow Detection of High Pressure Welding Joints in Boiler and Turbine Area of (2x660 MW), SSCTPS, RVUN, Suratgarh
Annual Contract for the work of hydro jet cleaning of Boiler Furnace of Unit 7 and 8, SSCTPS, RVUN, Suratgarh
Annual contract for the Work of In-situ repair of various valves in Boiler and Turbine Area, 2x660 MW, SSCTPS, RVUN, Suratgarh
Supply, Installation, Testing and Commissioning of Air Cooled Ductable Package AC unit for Marriage Hall at STPS, Suratgarh
Annual Work of Online safety valve setting by Trevi Testing method for Boiler and Turbine Area, 2X660MW, Unit 7 and 8, SSCTPP, Suratgarh