Supply of spares of Air washers/Pumps and Cooling Towers for Central Air- Conditioning System installed at STPS, Suratgarh
Retrofitting and up-gradation of 2 Nos. chlorine dosing system from 10 Kg/Hr to 20 Kg/Hr capacity installed at Chemical house stage-I for SSTPS, Suratgarh.
TN-MM-2089 Supply of spares of ESP for 6 x 250 MW, Unit 1 to 6, Stage I to IV, STPS, RVUN Suratgarh
Supply of spares of GE make LT switchgear installed in Electrical and CHP circle at STPS,Suratgarh
Routine / Breakdown /capital maintenance work of CCW / ACW pumps ,cooling tower, associated LP piping, EOT cranes, and up keep of the surrounding area of 6X250 MW, Suratgarh Thermal Power Station, Stage-I, II, III, and 1V (Unit 1 to 6),Suratgarh.
Annual contract for Routine, Breakdown, Annual maintenance of TDBFP, MDBFP, CEP, Vacuum Pumps, Oil system and their Auxiliaries of 2x660MW, SSCTPP, RVUNL Suratgarh