Loading…
Loading…
72 results • Recent activity
RWD/RANCHI/ 53/ STPKG/16/ 2023-24Strengthening of Road from (1)Kochatoli to Vikash Nagar (Length-0.80 Km.) (2) Saparum Hahap to Tunju (Length-10.30 Km.) (3) Simalia to Lalgarh (Length-2.00 Km.) (4) Purulia Road to Lupung Basti Purulia Road via Berwar
Construction of PCC Road from Upper Mithkugarha to Lower Chudil Topa At Village Pahad Tudurma
RWD/RANCHI/ 39/2024-25 Construction of Road from Sitafall Mukhya Path to Deepatoli (Length-1.00 km.)
Construction of Approach Road for District Collectorate Gumla (L-0.300 Km.),District -Gumla
Construction of Guardwall at Sundertoli to Kerabeda Road in Kerabeda Jhariya, G.P-Domtoli, Block-Kolebira.
Construction of 2 Span Culvert at Sundratoli to Kerabeda Road in Kerabeda Jhariya, G.P-Domptoli, Block-Kolebira.