Installation of Additional 5 MVA Old and Used Transformer at 33 11 KV Substation Mampur Bana from 1 No 10 MVA and 1 No 5 MVA to 1 No 10 MVA and 2 No 5 MVA as per Stock Issue Rate 2025 26 Under Business Plan 2026 27
Construction of Damaged 33 KV UG SC Line of 33 11 KV Substation Line from Maruti Showroom to Exposure as per Stock Issue Rate 2025 26 Under Business Plan 2026 27
Construction of 33 KV UG SC Line from 220 KV BKT to 33 11 KV Substation Mampur Bana as per Stock Issue Rate 2025 26 Under Business Plan 2026 27
Construction of 33 KV Interlinking Line from 33 11 KV Substation Daud Nagar to 33 11 KV Substation Faizullaganj as per Stock Issue Rate 2025 26 Under Business Plan 2026 27
Increasing Capacity of 25 Nos DTs (20 Nos. 25 to 63 KVA) (05 Nos. 63 to 100KVA) Work at different places in the work area of (Assistant Engineer 11KV LT NCLU) of 33/11 KV Substation, RCM, RAITHA ROAD NCLU
Increasing Capacity of 25 Nos. Distribution Transformers 25 to 63 KVA, 63 to 100KVA AND 100 to 250KVA Installed at different places in the work area of (Assistant Engineer 11KV AND LT BKT and NCLU) of 33/11 KV Substation, SADAMAU, RCM AND RAITHA ROAD