Loading…
Loading…
219 results • Recent activity
Service Contract for Housekeeping/cleaning work at different location of CHP, SgTPP (2X300MW, 2X500MW) for two months through ELT.
Repairing replacement of cooling tower CW return line header and return line header to FCV (Flow Control Valve) connecting damage pipe during U1 OH25 period
Repairing and life enhancement of Boiler and ESP structure of Unit4 at SgTPP, WBPDCL.
Biennial Maintenance Contract (Mandatory Jobs and Other Jobs) under the scope of CnI-III (1x660 MW), SGTPP.
Contract for Repairing or Replacement of earthing strip and refurbishment of cable tray structures at CT-1 under the scope of EMOPH at SGTPP during Unit-1 Overhauling.
Electrical Work for New Chemical Building under EMOPH Department, SgTPP.