Loading
Loading…
Loading…
11 results • Latest
Internal Clearance of Karontha Sub Mior from RD 0 to 6350 for the year 2026
LLaying 250 mm dia HDPE Pipe PE-80 Grade PN-4 for Dewatering of flood water from low lying area of fields of Village Baland through already laid RCC Pipe Line into Ditch Drain along JLN Feeder.
Repairing damaged lining patch at various RDs of Asanda Minor
Internal Clearance of both left and Right side Ditch Drain from RD 0 to 20000 along Dulhera Disty. from RD 46500 to 66500 for year 2026.
Internal Clearance of Mattan Link Drain from RD 0 to 45295 for the year 2026