Loading…
Loading…
272 results • Recent activity
Steel Almirah/Cabinets conforming to IS 3312 (V4) (Q3), Chairs - Handcrafted (Q3), Dining Tables - Handcrafted (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6933851 Dated : 26-11-2025 Bid Document 1/6 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Steel Almirah/Cabinets conforming to IS 3312 (V4) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Unbranded Yellow Colored Steel Shelving Cabinets
Solar Street Lighting System (NTPC) (Q3) (3 (3 ))
Unbranded C3525E Solar Power Plant (Roof Top) for ONGRID System,, Unbranded C3525E Solar Power Plant (Roof Top) for ONGRID System, Single Phase 3 kw power with voltage 240 V
Unbranded In line with DRDO technology Ultrasonic based Fog, Unbranded In line with DRDO technology Ultrasonic based Fog Sanitizer, Capacity 6 litre/hr
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7018055 Dated : 18-12-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No