Loading…
Loading…
42 results • Recent activity
Desilting and Strengthening of Chautang Nallah D/s Ambala-Jagadhri Road From RD 3000 to RD 48000 (From Village Kanhri Khurd to Jharchandna in District Yamunanagar)
Estimate for making pucca road with inter locking paver block on left bank of BML-HB-BB-MPLC from RD 45000 to 56000 for the protection of abadi area
Construction of pavered path on left bank of Rakshi Nadi between RD 29800 to 35500 Babain Road to Pipli Road
Laying of CC Lining inner parameter from RD 49700 to 50700 including lining of out side bank near Rd 50200/R in length of 600 ft of BML-HB-BB-MPLC for the protection of abadi area
Repair of damaged C/C lining (Toe Wall) outside of left bank of BML-HB-BB-MPLC reach B/w RD 45000 to 57000 for the protection of abadi area
Internal Clearance of water hycinth, vegetation and floating debris from Sarasvati River RD 0 to RD 22960 (Reserved for Co-Op LandC Society only