Loading…
Loading…
44 results • Recent activity
Bearings Inspection and Alignment of Rotors, Casings Centering, Roll Checks, Bump Check, Swing Check, Horn Drop Check, Generator seals, end shields removal and re-assembly works etc. as per SOW at Unit 3, KPCL-Raichur TPS
Bearings inspection, Overhaul of LPT 1 , LPT 2, MPI , NFT on LPT rotor and optional works at Unit 2, TNPGCL- North Chennai TPS Stage-II (2x600MW)
Inspection of TG Bearings 1,2 and 5 and Roll check and bump checks of HPT and IPT, including swing check at HPT front etc. at Unit-3, APPDCL SDSTPS (800MW)
COH of HIP, LP Turbine and Generator including Replacement of HIP Inner casing and Generator Stator Airgap correction as per SOW at Unit No.5, HIL-AAP, Lapanga (150MW)
C and I - R and M- Dismantling and Erection, Testing, Commissioning works for Upgradation of SG, TG and Station C and I control system with latest VALMET DNA control system as per SOW at Unit No. 5 and 6, APGENCO- Dr. NTTPS-Stage-III , 2x210MW
Overhauling of HP and LP Turbines, Generator rotor installation, Governing system overhauling, HP governor valve replacement, Governor calibration and Turbine blade/diaphragm repair works at Unit-1, NPCIL Kaiga GS (235MWe)