Loading…
Loading…
980 results • Recent activity
Interactive Panels with CPU (Q2) (3 (3 ))
Air Compressor, Spark Plug Cleaning Machine, Screw Driver Set, Ring Spanner Set, Open End Spanner Set, Socket Goti Spanner Set, Pliers, Monkey Pliers, Outer and Inner Pliers, Tool Box, Tee Spanner, Allen Key Set, Tappet Puller, Tappet Gauge, Digital Multimeter, Tachometer, Hammer Set, Tyre Pressure Gauge, Oil Measurement Can, Oil Cane Mannual Pump, Tool Trolley, Magnetic Coil, Drain Pain, Hydraulic Jack, Bench Vice, Pneumatic Rivet Nut Gun, Oil Pressure Gauge, Allen Watch, Chain Watch, Locking Watch, Carbon Scraper, Gasket, Scraper 01 set, Vernier Caliper Digital, Micrometer, Flow Meter, Temperature Gauge, Dial Gauge, Hand Tools, Power tools, Lifting Jack Tools, Brake Roller Tester, Chassis Dynamometer, Portable Car Washer, Tools, Gloves, Safety Shoes, Fire Extinguisher, Safety Glasses, Head Protection, Safety Rescue Hook, Insulated Rubber Mat, Warning Sign Stickers, Post and Chain, Face Mask, Two Wheeler EV Trainer Kit, Two Wheeler Work Bench, DC Fast Charger, Hand Fire Extinguisher, Air Racket, Stud Remover, Stud Remover With Socket, Tap and Dive, Torque Wrench, Tubeless Tyre Repair Kit, Threat wear indicator, 4 Point relay, 5 Point relay, Three Wheeler, Old Second Hand Lead Acid Battery, BMS Tester, BLDC Motor, Soldering Iron Kit, EV Charging System, Power Steering, Suspension Kit, Battery Load Tester, Battery Charger, Hub Motor Kit, Disck Brake Assembly, Battery Cell Lithium Ion, Powertrain With Differential Bid Number : GEM/2026/B/7072277 Dated : 07-01-2026 Bid Document 1/57
Tool Kit of Agriculture Skill for 04 Level T and E (HSSPP, Haryana) (Q3)
Sewing Kit (Q3) (3 (3 ))
Manikins for CPR with Airway Training (Q3) (3 (3 ))
Books (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/7017011 Dated : 18-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 18 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DEO District Education Office Bhind, School Education Department Madhya Pradesh, N/A, (District Education Officer Bhind)