Loading…
Loading…
2,159 results • Recent activity
REPAIR OF CC DRAIN FROM H/O-SANTOSH DAS TO H/O DILIP SETH. (LENGTH - 30.00M) AT BOOTH NO-25/296 AT MATIGARA-II G.P UNDER MATIGARA BLOCK
REPAIR OF C.C ROAD FROM AMTALA TO H/O BISWAJIT MANDAL (LENGTH-455.00 M WIDTH-3.00 M) AT BOOTH NO-25/296 AT MATIGARA-II G.P UNDER MATIGARA BLOCK.
REPAIR OF C.C ROAD FROM AMTALA TO H/O BISWAJIT MANDAL (LENGTH-455.00 M WIDTH-3.00 M) AT BOOTH NO-25/296 AT MATIGARA-II G.P UNDER MATIGARA BLOCK.
Const of PCC Drain with slab from Arun Dey house to Thana Gate at Jyotinagar. Part No-25/37. Fund -APAS/UBGP/2025-26.
Construction of C.C Road from H/O Dhiren Malpaharia to Main road at Line No-11.(Length 70.00 m width-3.00 m) at booth no-25/295 at Matigara-II G.P under Matigara Block
Construction of C.C Road from H/o Ramesh Orao to H/O Runi Munda at Line No-04 (Length 326.00 m width-3.00 m) at booth no-25/295 at Matigara-II G.P under Matigara Block