Loading…
Loading…
73 results • Recent activity
Reconstruction of VRB at Rd. 2810 and 3000 m, New construction of Direct outlet at Rd. 1300 m, Repairing of Main H.R.Gate and C.C.Lining at Rd.1000 to 1200 m and 2500 to 2650 m on main canal of Sonegaon Minor irigation Project.
Repair Work of Dangurli Lift Irrigation Scheme Pumphouse Building and canal system ta.GondiaDist.Gondia
New construction of H.P.C above Sukatola small canal of pipariya small project at 350m and lining between 350m and 520m as well as repair work of downstream wing wall on the right side of the spillway attached to the dam
Repair work of waste weir of Tedha Ex.mal tank
Repairs To The Technical Section Office Slab Of The Division Office, Repairs To The Section Office At Murdoli Irrigation Section, Repairs To The Section Office At Deori Irrigation Section.
Lining of RBC at RD.300m to RD 310m ,Repairs of HPC on Majitpur minor of RBC at RD.700m and RD.1960m and Construction of HR/Outlet of Hanumantola Minor of LBC at RD 220m of Hari M.I.Project