Loading…
Loading…
73 results • Recent activity
Repairs of Outlet RD 300m 600m, 700m, 11295m, and Over Topping with Resectioning RD 9168 to 9268 m On Rawanwadi distributory Of Tekepar LIS
Repair of Outlet RD 220m, 735m, 880m, 1000m, 1190m, 1305, 1405m, on Pahela minor and of Outlet RD 75m, OL1 and OR1, 280m, OR2,350m OL2and OR3,710m OR4 and OL3 On Pahela Sub Minor On Pahela Minor Of Tekepar LIS
Repair to Outlet RD 5415M L/R, 3590m /R On Sihora Minor,1050 m/L sindpuri minor no.1,3050m /R 3200m/R on sindpuri minor no.2, Outlet RD 190M/ L On Yerali Distributary,Construction of Outlet RD 8750M/L On Yerali Distrib
Repairs to Head Regulator of Niharwani M.I. Tank.
Reconstruction of Cross Regulator at RD 800m on Main Canal Repairs to Outlet at RD 2000, 2020, 4000, 4600 and 4950 on Main Canal of Betekar Bothali Medium Project.
Construction of Pipe Distribution Network System at RD 600 to 810 M and RD 1050 to 1140 M on Sorna Feeder Canal Under Sorna Medium Project.