Loading…
Loading…
212 results • Recent activity
UWS Schms/SH- Urgnt shftng DI pipeline, S/V, S/V chmbers, othr allied wrks at Chanban N.S. bridge tri-junction area undr DWS SD No.-I, UDP, Gomati District during the year 2025-26. (Deposit Work)
FDR/Periodicl mtc of NRDWP/JJM schems undr Killa R.D. Block 2025-26/SH-Repair and mtc of burnt/disordr Submrsible Pump Motr of diff cap includng liftng lowrng at diff DTW schems undr DWS SD, Killa.
JJM Scheme in Amarpur RD Block under Gomati District during the year 2024-25/SH- Drilling and development of 4(Four) Nos. Small Bore Deep Tube Well(SBDTW) by manual means in/c. installation of pump set, electrical panel board to be install in M.S KIO
Mtc. of diff DTW scheme unde Jamjuri GP/SH Repairig of leakge, washng of PVC, CI, DI,GI pipelins and extnsn of pipelne etc. at diff locatn withn DWS SD Kakrbn 2025-26. (Deposit Work)
Rewinding of motors, Repairing of pumps of different DTW and SBDTW schemes along with Lifting and Lowering under Bokafa RD Block within the jurisdicton of DWS Santirbazar Sub-Division during the year 2025-26 (Gr-II).
Mtc of pipeline by repairing of leakage, washing of pipeline, extension of pipe line and other works in DTW schemes in different locations of Kanchan Nagar GP, East Bagafa GP under Bokafa RD Block under DWS Sub-Division Santirbazar (FFC Grant).