Loading…
Loading…
211 results • Recent activity
Maintenance and repairing of existing SBDTW Schemes at different locations under Rajnagar Block area under DWS Sub-Division Barpathari during the year 2025-26.
Deployment of Truck for Drinking Water supply by Polythene Storage Tank during scarcity of drinking water in different Pockets/Spots/ Habitations within Jolaibari R.D. Block during the year 2025-26.
Construction of 01 (One) no SBDTW, Installation of Submersible Pump Motor set in/c other allied works at Near the house of Sen Chandra Tripura under PMAAGY Scheme at Rathi Para of East Pilak VC under Jolaibari RD Block (Deposit work).
Lifting and Lowering of submersible pump motor etc. at different DTW schemes under Rajnagar and B.C. Nagar RD Block under DWS Sub-Division Barpathari during the year 2025-26.
Maintenance of pipeline by repairing of leakage, washing of existing pipeline, all other allied works in DTW schemes in different locations under SMC under DWS Sub-Division Santirbazar during the year 2025-26.
Maintenance of pump house in different DTW scheme along with Maintenance of office building of DWS Sub-Division, Santirbazar under SMC area under jurisdiction of DWS Sub-Division Santirbazar during the year 2025-26.