Loading…
Loading…
533 results • Recent activity
Stub Repairing work at Tower Location No 39B 0 40A 0 and 42A 0 09 Stub of 132 KV Usawan Tilhar Line under ETD Budaun
Replacement of Missing Tower Parts of 132KV S C Line and tack welding with other associated works under ETD Budaun
Deputation of the Service Engineer for the work of configuration of the stand by CPT cum gateway in the existing SICAM, Siemens make SCADA system installe at 220KV SS Pilibhit under E.T.D. - II, Bareilly
Preventive, Routine General Normal Breakdown Maintenance Daily General Cleaning alongwith other associated Works at 132KV Sub Station Richha, Bareilly under E.T.D., Bareilly during the Period of 3 Months.
Operation, Preventive, Routine General Normal Breakdown Maintenance of 220/132/33KV S.A.S. Sub Station Pilibhit alongwith other associated Works under E.T.D. - II, Bareilly for the Period of 2 Month
Providing And Fixing Pilfer Proofing wiring of 33KV HPCL Bay at 220KV Substation Dataganj under ETD Budaun