Estimate for Removal of slip behind 22KV New bay for Interconnection of 43 Bn ITBP Police Kalna due to water leakage by providing wire crate wall etc.
Demolition and restoration of damaged existing RCC Foundation of Unit-II , Unit-IV including and repair/reconstruction of Tail Race side wall and bottom floor of Unit No-1 at Rongtong Power House under CMD Bhabanagar
Estimate for Dismantling, rebabiting , assembling and realignment of Unit-2 of Rongtong HEP.
Rectification of pressure build-up problem and ensuring proper functioning up to rated pressure and complete dismantling, inspection, repair, overhauling, replacement of worn-out parts (piston rings, valves, gaskets, filters, oil etc.), servicing, re
Major Repair of BHEL make Runner for repair of cracks and erode portion on runner root, buckets and splitter alogwith repair of W-shaped of buckets of 3x40MW SVP Bhaba Power House
Restoration of wire crates/stone masonry / panel fencing left side of Ganvi Khad from entry gate to TRC outfall of Ganvi Stage-II, RD 0.00 to 45.00 mtr. which was damaged due to heavy flood in Ganvi Khad on dated 13.08.2025 under Ganvi Power House Di