Loading…
Loading…
203 results • Recent activity
Reconstruction of Left ex-zamindari embankment of river Silabati (length 110 M) at Hiradharpur within G.P-Monoharpur-I, Block- Chandrakona-I, P.S-Chandrakona, District-Paschim Medinipur.
Protection work along right bank of River Kethiya for a length of 235 M at Dharampota, within G.P. Bhagabantapur-I, Block- Chandrakona-II, P.S.-Chandrakona, Dist. -Paschim Medinipur.
Flood protection and mitigation work of River bank errosion for a length of 25 m of Kethia River (Left.Emb.)for reducing vulnerability of people within Mouza-Bara, Manikkundu G.P. , Block - Chandrakona-I
Flood Protection and mitigation Work of Ex-Zamindari Embankment by repairing and strengthening of embankment for a length of 175.00 m of Silaboti River (Left Side) near Bhabanipur for reducing vulnerability of people within Mouza- Bhabanipur
M/R to Qtr. No. B-R 1 of Kangsabati Colony under Head Qtr. Section of K.C Sub-Division No.-VII, Amlagora, Paschim Medinipur during the year 2025-26.
F.P.M. to the Ex-Zamindari Embankments of river Silaboti under Bandipur -I G.P of Chandrokona-II Block during Monsoon 2025 under K.C. Sub Division No-l of K.C. Division No-I, Amlagora, Paschim Medinipur.